{"id":63265,"date":"2018-04-26T11:15:49","date_gmt":"2018-04-26T07:15:49","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-29T20:00:00","slug":"","status":"publish","type":"post","link":"https:\/\/ucnoqta.az\/?p=63265","title":{"rendered":"Etibar Pirverdiyev: \u201cMing\u0259\u00e7evir su elektrik stansiyas\u0131n\u0131n bu il istifad\u0259y\u0259 verilm\u0259si n\u0259z\u0259rd\u0259 tutulur\u201d"},"content":{"rendered":"<p><strong>&nbsp;2017-ci ild\u0259 respublikada &uuml;mumilikd\u0259 elektrik enerjisinin istehsal\u0131 21,8 mlrd. kilovat-saat t\u0259\u015fkil edib. Bunun 20,2 mlrd. kilovat-saat\u0131 istilik elektrik stansiyalar\u0131n\u0131n, 1,6 mlrd. kilovat-saat\u0131 is\u0259 su elektrik stansiyalar\u0131n\u0131n pay\u0131na d&uuml;\u015f&uuml;b.&nbsp;<\/strong><\/p>\n<p>Ucnoqta.az &ldquo;Report&rdquo;a istinad\u0259n x\u0259b\u0259r verir ki, bunu Yeni Az\u0259rbaycan Partiyas\u0131n\u0131n innetnet s\u0259hif\u0259sin\u0259 m&uuml;sahib\u0259sind\u0259 &ldquo;Az\u0259renerji&rdquo; ASC-nin s\u0259dri Etibar Pirverdiyev deyib.<\/p>\n<p>Bundan ba\u015fqa, onun s&ouml;zl\u0259rin\u0259 g&ouml;r\u0259, bu il Ming\u0259&ccedil;evir su elektrik stansiyas\u0131 yenid\u0259n qurulmadan sonra istifad\u0259y\u0259 veril\u0259c\u0259k: &ldquo;Cari ild\u0259 elektroenergetika sistemind\u0259 bir s\u0131ra yenilikl\u0259rin olaca\u011f\u0131 g&ouml;zl\u0259nilir. 2010-2017-ci ill\u0259rd\u0259 apar\u0131lan yenid\u0259nqurma i\u015fl\u0259ri &ccedil;\u0259r&ccedil;iv\u0259sind\u0259 g&uuml;c&uuml; 424 MVt-a &ccedil;atd\u0131r\u0131lm\u0131\u015f Ming\u0259&ccedil;evir su elektrik stansiyas\u0131n\u0131n 2018-ci ild\u0259 istifad\u0259y\u0259 verilm\u0259si n\u0259z\u0259rd\u0259 tutulur. 2011-ci il 21 sentyabr tarixind\u0259 Bak\u0131 \u015f\u0259h\u0259rind\u0259 409 MVt g&uuml;c&uuml;nd\u0259 &quot;\u015eimal-2&quot; elektrik stansiyas\u0131n\u0131n t\u0259m\u0259li qoyulub. Art\u0131q burada son tamamlama i\u015fl\u0259ri apar\u0131l\u0131r v\u0259 stansiyan\u0131n cari ild\u0259 istismara verilm\u0259si g&ouml;zl\u0259nilir. Lerik rayonunda tikil\u0259n 16,5 MVt g&uuml;c&uuml;nd\u0259 elektrik stansiyas\u0131 da 2018-ci ild\u0259 istismara veril\u0259c\u0259k. Son ill\u0259rd\u0259 respublikam\u0131zda ki&ccedil;ik su elektrik stansiyalar\u0131n\u0131n tikintisi d\u0259 geni\u015f v&uuml;s\u0259t al\u0131b. Art\u0131q yeni tikil\u0259n bir ne&ccedil;\u0259 su elektrik stansiyas\u0131 u\u011furla f\u0259aliyy\u0259t g&ouml;st\u0259rir. Cari ild\u0259 bu q\u0259bild\u0259n olan &quot;Astara-1&quot;, &quot;O\u011fuz-1&quot;, &quot;O\u011fuz-2&quot; v\u0259 &quot;O\u011fuz-3&quot; ki&ccedil;ik su elektrik stansiyalar\u0131n\u0131n istifad\u0259y\u0259 verilm\u0259si n\u0259z\u0259rd\u0259 tutulur&rdquo;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp;2017-ci ild\u0259 respublikada &uuml;mumilikd\u0259 elektrik enerjisinin istehsal\u0131 21,8 mlrd. kilovat-saat t\u0259\u015fkil edib. Bunun 20,2 mlrd. kilovat-saat\u0131 istilik elektrik stansiyalar\u0131n\u0131n, 1,6 mlrd. kilovat-saat\u0131 is\u0259 su elektrik stansiyalar\u0131n\u0131n pay\u0131na d&uuml;\u015f&uuml;b.&nbsp; Ucnoqta.az &ldquo;Report&rdquo;a&hellip;<\/p>\n","protected":false},"author":1,"featured_media":251278,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[],"tags":[],"class_list":["post-63265","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/posts\/63265","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=63265"}],"version-history":[{"count":0,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/posts\/63265\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/media\/251278"}],"wp:attachment":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=63265"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=63265"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=63265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}