{"id":50559,"date":"2017-09-25T12:35:59","date_gmt":"2017-09-25T08:35:59","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-29T20:00:00","slug":"","status":"publish","type":"post","link":"https:\/\/ucnoqta.az\/?p=50559","title":{"rendered":"<font color=red><b>T\u0259z\u0259 ild\u0259 Bak\u0131da yeni metrostansiya a\u00e7\u0131lacaq<\/b><\/font>"},"content":{"rendered":"<p>1967-ci il noyabr\u0131n 6-da istifad\u0259y\u0259 veril\u0259n Bak\u0131 Metropoliteninin haz\u0131rda 25 stansiyas\u0131,1 elektrik deposu v\u0259 36,6 kilometr uzunlu\u011funda 3 x\u0259tti var.&nbsp;<\/p>\n<p>Ucnoqta.az x\u0259b\u0259r verir ki, &ldquo;Bak\u0131 Metropoliteni&rdquo; QSC-nin m\u0259tbuat xidm\u0259tinin r\u0259hb\u0259ri N\u0259simi Pa\u015fayev modern.az-a tikintisi davam etdiril\u0259n stansiya v\u0259 depolarla ba\u011fl\u0131 son m\u0259lumatlar\u0131 verib.<\/p>\n<p>O qeyd edib ki, haz\u0131rda &ldquo;Papanin&rdquo; adlanan \u0259razid\u0259 tikinti i\u015fl\u0259ri davam etdirilir:<\/p>\n<p>&ldquo;B\u0259n&ouml;v\u015f\u0259yi x\u0259ttin B3 (\u015f\u0259rti ad) stansiyas\u0131nda tikinti i\u015fl\u0259ri davam etdirilir. \u018fg\u0259r i\u015fl\u0259r qaydas\u0131nda ged\u0259rs\u0259, stansiyan\u0131n 2018-ci ild\u0259 a&ccedil;\u0131lmas\u0131 planla\u015fd\u0131r\u0131l\u0131r. Eyni zamanda, Xocah\u0259s\u0259nd\u0259 B\u0259n&ouml;v\u015f\u0259yi x\u0259ttin, D\u0259rn\u0259g&uuml;ld\u0259 Ya\u015f\u0131l x\u0259ttin ikinci deposunun tikintisi apar\u0131l\u0131r. Perspektiv inki\u015faf plan\u0131na uy\u011fun olaraq yeni x\u0259tl\u0259rin tunel, stansiya v\u0259 depolar\u0131n\u0131n in\u015fas\u0131 il\u0259 yana\u015f\u0131, m&ouml;vcud stansiyalar\u0131n m\u0259rh\u0259l\u0259l\u0259rl\u0259 yenid\u0259n qurulmas\u0131 v\u0259 m&uuml;asir avadanl\u0131qlarla t\u0259chiz olunmas\u0131, d\u0259rin &ouml;z&uuml;ll&uuml; bir&ccedil;\u0131x\u0131\u015fl\u0131 stansiyalar\u0131n ikinci &ccedil;\u0131x\u0131\u015flar\u0131n\u0131n tikintisi n\u0259z\u0259rd\u0259 tutulub&rdquo;.<\/p>\n<p>Qeyd ed\u0259k ki, perspektiv plana \u0259sas\u0259n, &uuml;mumi uzunlu\u011fu 28,5 km olacaq m&ouml;vcud Q\u0131rm\u0131z\u0131 x\u0259tt Badamdar q\u0259s\u0259b\u0259sind\u0259n ba\u015flayaraq Z\u0131\u011f q\u0259s\u0259b\u0259sin\u0259d\u0259k uzanacaq. 19 stansiyadan ibar\u0259t olacaq x\u0259ttin haz\u0131rda 13 stansiyas\u0131 v\u0259 1 elektrik deposu istismardad\u0131r. Layih\u0259d\u0259 &laquo;\u0130&ccedil;\u0259ri\u015f\u0259h\u0259r&raquo; stansiyas\u0131ndan sonra 4, &laquo;H\u0259zi Aslanov&raquo; stansiyas\u0131ndan sonra 2 stansiyan\u0131n in\u015fas\u0131 n\u0259z\u0259rd\u0259 tutulub. &Uuml;mumi uzunlu\u011fu 41,8 km olacaq Ya\u015f\u0131l x\u0259tt X\u0259tai, N\u0259simi, Yasamal, Bin\u0259q\u0259di, N\u0259rimanov, Nizami, Sabun&ccedil;u v\u0259 Suraxan\u0131 rayonlar\u0131n\u0131 \u0259hat\u0259 ed\u0259c\u0259k. Perspektiv inki\u015faf plan\u0131na uy\u011fun olaraq, g\u0259l\u0259c\u0259kd\u0259 bu x\u0259tt &uuml;zr\u0259 Bak\u0131 metrosunda ilk d\u0259f\u0259 qatarlar\u0131n dair\u0259vi h\u0259r\u0259k\u0259ti t\u0259\u015fkil olunacaq. 23 stansiyas\u0131 olacaq bu x\u0259ttin haz\u0131rda 10 stansiyas\u0131 istismardad\u0131r. X\u0259ttin bir elektrik deposu haz\u0131rda in\u015fa olunur, daha biri is\u0259 layih\u0259l\u0259ndirm\u0259 m\u0259rh\u0259l\u0259sind\u0259dir.<\/p>\n<p>Perspektiv inki\u015faf plan\u0131na uy\u011fun olaraq, &ldquo;28 May&rdquo; stansiyas\u0131n\u0131n layih\u0259sini d\u0259qiql\u0259\u015fdir\u0259r\u0259k yenid\u0259n qurulmas\u0131n\u0131n ba\u015fa &ccedil;atd\u0131r\u0131lmas\u0131 il\u0259 m&ouml;vcud Q\u0131rm\u0131z\u0131 v\u0259 Ya\u015f\u0131l x\u0259tl\u0259rd\u0259 qatarlar\u0131n s\u0259rb\u0259st h\u0259r\u0259k\u0259tinin t\u0259\u015fkili n\u0259z\u0259rd\u0259 tutulub.<\/p>\n<p>Uzunlu\u011fu 18,5 km olacaq yeni B\u0259n&ouml;v\u015f\u0259yi x\u0259tt Xoc\u0259s\u0259n q\u0259s\u0259b\u0259sind\u0259n ba\u015flayaraq Qara&ccedil;uxur q\u0259s\u0259b\u0259sin\u0259d\u0259k uzanacaq. Metropolitenin perspektiv inki\u015faf plan\u0131n\u0131n birinci prioritet istiqam\u0259tin\u0259 daxil olan B\u0259n&ouml;v\u015f\u0259yi x\u0259ttin &laquo;Avtova\u011fzal&raquo; v\u0259 &laquo;Memar \u018fc\u0259mi&raquo; stansiyalar\u0131 2016-c\u0131 il aprel ay\u0131n\u0131n 19-da s\u0259rni\u015finl\u0259rin istifad\u0259sin\u0259 verilib.<\/p>\n<p>Perspektiv inki\u015faf plan\u0131na uy\u011fun olaraq bu x\u0259tt &uuml;zr\u0259 6-s\u0131 ke&ccedil;id olmaqla, 10 yeni stansiya in\u015fa olunmal\u0131d\u0131r. Haz\u0131rda Xoc\u0259s\u0259n q\u0259s\u0259b\u0259sind\u0259 B\u0259n&ouml;v\u015f\u0259yi x\u0259ttin deposunun tikintisi davam edir.<\/p>\n<p>Uzunlu\u011fu 16,3 km olacaq Mavi x\u0259tt Yeni Yasamal ya\u015fay\u0131\u015f sah\u0259sind\u0259n ba\u015flayaraq Sabun&ccedil;u rayonunun Bak\u0131xanov q\u0259s\u0259b\u0259sin\u0259 q\u0259d\u0259r uzanacaq. X\u0259tt &uuml;zr\u0259 7-si ke&ccedil;id olmaqla, 11 stansiya v\u0259 1 elektrik deposu tikil\u0259c\u0259k.<\/p>\n<p>Uzunlu\u011fu 14,7 km olacaq Sar\u0131 x\u0259tt Bin\u0259q\u0259di rayonundan ba\u015flayaraq S\u0259bail rayonunun Bay\u0131l q\u0259s\u0259b\u0259sin\u0259d\u0259k uzanan x\u0259tt olacaq. Bu x\u0259td\u0259 5-i ke&ccedil;id olmaqla, 11 stansiya v\u0259 1 elektrik deposu in\u015fa olunacaq.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>1967-ci il noyabr\u0131n 6-da istifad\u0259y\u0259 veril\u0259n Bak\u0131 Metropoliteninin haz\u0131rda 25 stansiyas\u0131,1 elektrik deposu v\u0259 36,6 kilometr uzunlu\u011funda 3 x\u0259tti var.&nbsp; Ucnoqta.az x\u0259b\u0259r verir ki, &ldquo;Bak\u0131 Metropoliteni&rdquo; QSC-nin m\u0259tbuat xidm\u0259tinin r\u0259hb\u0259ri&hellip;<\/p>\n","protected":false},"author":1,"featured_media":251278,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[],"tags":[],"class_list":["post-50559","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/posts\/50559","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=50559"}],"version-history":[{"count":0,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/posts\/50559\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/media\/251278"}],"wp:attachment":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=50559"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=50559"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=50559"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}