{"id":102562,"date":"2020-08-21T14:19:00","date_gmt":"2020-08-21T10:19:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-29T20:00:00","slug":"","status":"publish","type":"post","link":"https:\/\/ucnoqta.az\/?p=102562","title":{"rendered":"Prezident \u0130lham \u018fliyev \u201cQobu\u201d elektrik yar\u0131mstansiyas\u0131n\u0131n tikintisi il\u0259 tan\u0131\u015f olub <font color=red><b>-FOTO (Yenil\u0259nib)<\/b><\/font>"},"content":{"rendered":"<p><strong>Az\u0259rbaycan Respublikas\u0131n\u0131n Prezidenti \u0130lham \u018fliyev avqustun 21-d\u0259 1000 meqavat y&uuml;k&ouml;t&uuml;rm\u0259 g&uuml;c&uuml; olan 330\/220\/110 kilovoltluq &ldquo;Qobu&rdquo; yar\u0131mstansiyas\u0131n\u0131n tikintisi il\u0259 tan\u0131\u015f olub.<\/strong><\/p>\n<p>D&ouml;vl\u0259timizin ba\u015f&ccedil;\u0131s\u0131, h\u0259m&ccedil;inin 385 meqavatl\u0131q &ldquo;Qobu&rdquo; Elektrik Stansiyas\u0131n\u0131n t\u0259m\u0259lini qoyub.<br \/>\n&ldquo;Az\u0259renerji&rdquo; A&ccedil;\u0131q S\u0259hmdar C\u0259miyy\u0259tinin prezidenti Baba Rzayev d&ouml;vl\u0259timizin ba\u015f&ccedil;\u0131s\u0131na m\u0259lumat verdi ki, 330\/220\/110 kilovoltluq &ldquo;Qobu&rdquo; yar\u0131mstansiyas\u0131n\u0131n in\u015fas\u0131 u\u011furla gedir. Hasil olunan elektrik enerjisinin enerjisistem\u0259 &ouml;t&uuml;r&uuml;lm\u0259si, Bak\u0131n\u0131n v\u0259 Ab\u015feron yar\u0131madas\u0131n\u0131n elektrik enerjisi t\u0259chizat\u0131nda 500\/330\/220 kilovoltluq &ldquo;Ab\u015feron&rdquo; yar\u0131mstansiyas\u0131ndan as\u0131l\u0131l\u0131\u011f\u0131n aradan qald\u0131r\u0131lmas\u0131, istehlak&ccedil;\u0131lar\u0131n fasil\u0259siz v\u0259 dayan\u0131ql\u0131 elektrik enerjisi t\u0259chizat\u0131n\u0131n t\u0259min edilm\u0259si, respublika \u0259razisind\u0259 330 kilovoltluq dair\u0259vi elektrik t\u0259chizat sxeminin yarad\u0131lmas\u0131 &uuml;&ccedil;&uuml;n bu yar\u0131mstansiya m&uuml;st\u0259sna rola malikdir. &ldquo;Qobu&rdquo; yar\u0131mstansiyas\u0131n\u0131n x&uuml;susi &ouml;z\u0259lliyi ondan ibar\u0259tdir ki, bu, Bak\u0131da tikil\u0259n ilk 330 kilovoltluq yar\u0131mstansiya olacaq v\u0259 \u0259n \u0259sas\u0131, &ouml;lk\u0259nin \u0259n strateji yar\u0131mstansiyas\u0131 olan 500 kilovoltuq &ldquo;Ab\u015feron&rdquo; yar\u0131mstansiyas\u0131n\u0131n \u0259v\u0259zedicisi funksiyas\u0131n\u0131 da\u015f\u0131yacaq. &ldquo;Qobu&rdquo; yar\u0131mstansiyas\u0131n\u0131n enerjisistem\u0259 inteqrasiyas\u0131n\u0131n 2 m\u0259rh\u0259l\u0259d\u0259 h\u0259yata ke&ccedil;irilm\u0259si n\u0259z\u0259rd\u0259 tutulur.<\/p>\n<p>&Ouml;lk\u0259d\u0259 enerji t\u0259minat\u0131n\u0131n \u0259sasl\u0131 \u015f\u0259kild\u0259 yax\u015f\u0131la\u015fd\u0131r\u0131lmas\u0131, b&ouml;y&uuml;k infrastruktur layih\u0259l\u0259rin icras\u0131 bax\u0131m\u0131ndan m&uuml;h&uuml;m i\u015fl\u0259r g&ouml;r&uuml;l&uuml;b. Lakin elektroenergetika sektorunun daim inki\u015faf ed\u0259n sah\u0259 oldu\u011funu, \u0259halinin art\u0131m tempini, s\u0259nayel\u0259\u015fm\u0259 prosesini n\u0259z\u0259r\u0259 alaraq sonrak\u0131 d&ouml;vrd\u0259 generasiya g&uuml;cl\u0259rin\u0259 t\u0259l\u0259bat\u0131n m&uuml;\u0259yy\u0259nl\u0259\u015fdirilm\u0259si v\u0259 onun vaxt\u0131nda qar\u015f\u0131lanmas\u0131 konkret v\u0259zif\u0259 olaraq qar\u015f\u0131ya qoyulub. 385 meqavat g&uuml;c&uuml;nd\u0259 &ldquo;Qobu&rdquo; Elektrik Stansiyas\u0131n\u0131n generasiya m\u0259nb\u0259yi olaraq yarad\u0131lmas\u0131 da qar\u015f\u0131ya qoyulan m&uuml;h&uuml;m v\u0259zif\u0259nin \u0259sas komponentl\u0259rind\u0259ndir.<\/p>\n<p>Yar\u0131mstansiya il\u0259 tan\u0131\u015fl\u0131qdan sonra Prezident \u0130lham \u018fliyev 385 meqavat g&uuml;c&uuml;nd\u0259 &ldquo;Qobu&rdquo; Elektrik Stansiyas\u0131n\u0131n t\u0259m\u0259lini qoydu.<\/p>\n<p>Qeyd ed\u0259k ki, bu stansiyan\u0131n tikintisi yax\u0131n ill\u0259rd\u0259 respublikada f\u0259aliyy\u0259t\u0259 ba\u015flayacaq bir s\u0131ra qeyri-neft s\u0259nayesi obyektl\u0259rinin, o c&uuml;ml\u0259d\u0259n \u018fl\u0259t q\u0259s\u0259b\u0259sinin yax\u0131nl\u0131\u011f\u0131nda yarad\u0131lacaq &ldquo;Azad \u0130qtisadi Zona&rdquo;n\u0131n etibarl\u0131 elektrik enerjisi il\u0259 t\u0259chizat\u0131nda m&uuml;h&uuml;m rol oynayacaq. &ldquo;Qobu&rdquo; layih\u0259sin\u0259 d&uuml;nyan\u0131n m\u0259\u015fhur \u015firk\u0259tl\u0259ri y&uuml;ks\u0259k r\u0259y verm\u0259kl\u0259 yana\u015f\u0131, onun tikintisind\u0259 yax\u0131ndan i\u015ftirak edirl\u0259r.<\/p>\n<p>&ldquo;Qobu&rdquo; Enerji layih\u0259si, o c&uuml;ml\u0259d\u0259n 385 meqavat g&uuml;c&uuml;nd\u0259 &ldquo;Qobu&rdquo; Elektrik Stansiyas\u0131n\u0131n tikintisi &ouml;lk\u0259nin enerji sistemind\u0259 bir m\u0259nb\u0259d\u0259n as\u0131l\u0131l\u0131\u011f\u0131 aradan qald\u0131rmaq, Bak\u0131 \u015f\u0259h\u0259rinin, &uuml;mumilikd\u0259 Ab\u015feron yar\u0131madas\u0131n\u0131n elektrik enerjisi il\u0259 t\u0259chizat\u0131n\u0131n dayan\u0131ql\u0131l\u0131\u011f\u0131n\u0131 v\u0259 etibarl\u0131l\u0131\u011f\u0131n\u0131 maksimum s\u0259viyy\u0259y\u0259 &ccedil;atd\u0131rma\u011fa hesablan\u0131b. Bu layih\u0259nin icras\u0131 dig\u0259r sosial m\u0259s\u0259l\u0259d\u0259 d\u0259 \u0259h\u0259miyy\u0259ti il\u0259 se&ccedil;ilir. Bel\u0259 ki, &ldquo;Qobu&rdquo; Elektrik Stansiyas\u0131 v\u0259 &ldquo;Qobu&rdquo; yar\u0131mstansiyas\u0131n\u0131n i\u015f\u0259 sal\u0131nmas\u0131 m\u0259\u015f\u011fullu\u011fun art\u0131r\u0131lmas\u0131na t&ouml;hf\u0259 olacaq. Burada 120-d\u0259n art\u0131q yeni i\u015f yeri yarad\u0131lacaq.<\/p>\n<p>Sonra Prezident \u0130lham \u018fliyev energetikl\u0259rl\u0259 g&ouml;r&uuml;\u015fd&uuml;.<\/p>\n<p>D&ouml;vl\u0259timizin ba\u015f&ccedil;\u0131s\u0131 g&ouml;r&uuml;\u015fd\u0259 &ccedil;\u0131x\u0131\u015f etdi.<\/p>\n<p>\n<strong>12:19<\/strong><\/p>\n<p>Az\u0259rbaycan Respublikas\u0131n\u0131n Prezidenti \u0130lham \u018fliyev avqustun 21-d\u0259 1000 meqavat y&uuml;k&ouml;t&uuml;rm\u0259 g&uuml;c&uuml; olan 330\/220\/110 kilovoltluq &ldquo;Qobu&rdquo; yar\u0131mstansiyas\u0131n\u0131n tikintisi il\u0259 tan\u0131\u015f olub.<\/p>\n<p>D&ouml;vl\u0259timizin ba\u015f&ccedil;\u0131s\u0131, h\u0259m&ccedil;inin 385 meqavatl\u0131q &ldquo;Qobu&rdquo; Elektrik Stansiyas\u0131n\u0131n t\u0259m\u0259lini qoyub.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Az\u0259rbaycan Respublikas\u0131n\u0131n Prezidenti \u0130lham \u018fliyev avqustun 21-d\u0259 1000 meqavat y&uuml;k&ouml;t&uuml;rm\u0259 g&uuml;c&uuml; olan 330\/220\/110 kilovoltluq &ldquo;Qobu&rdquo; yar\u0131mstansiyas\u0131n\u0131n tikintisi il\u0259 tan\u0131\u015f olub. D&ouml;vl\u0259timizin ba\u015f&ccedil;\u0131s\u0131, h\u0259m&ccedil;inin 385 meqavatl\u0131q &ldquo;Qobu&rdquo; Elektrik Stansiyas\u0131n\u0131n t\u0259m\u0259lini qoyub.&hellip;<\/p>\n","protected":false},"author":1,"featured_media":251278,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[],"tags":[],"class_list":["post-102562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/posts\/102562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=102562"}],"version-history":[{"count":0,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/posts\/102562\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=\/wp\/v2\/media\/251278"}],"wp:attachment":[{"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=102562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=102562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ucnoqta.az\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=102562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}